Before you get quotes
A full replacement is new construction, so plan on Madison’s deck permit and the inspection after the holes are dug. Do not assume old footings meet the 48-inch depth the city requires. If the new deck is taller than three feet, setbacks and a site plan apply.
- Inspection of old footings
- Permit for the new structure
- Demolition and disposal
- Same or new footprint
Sources: Wisconsin Uniform Dwelling Code, SPS 325 Appendix B · City of Madison Development Services Center, Decks. Checked November 9, 2026. Confirm current requirements with your building inspector.
Near Madison
Price check
See the Madison deck cost guide for 2026 published price ranges and permit fees from Madison and Verona.
Related
Questions about deck replacement
Are you the deck builder?
An independent builder you hire directly. This is a Madison-area referral site, so we pass your request along; we do not build, price or guarantee anything.
Will the old footings pass?
Only if they meet the current 48-inch depth and the inspector agrees. Plan for new ones if you are unsure.
Does a replacement need a site plan?
In Madison, a site plan is needed when the deck is over three feet high.
Is a permit needed?
In Madison, yes: the city says you need a permit to build a deck. Fitchburg requires one for decks 24 inches or more above grade, Sun Prairie wants a drawing and site plan, and Verona lists a $300 deck permit. Each Dane County community sets its own rules.
